top of page
Search

Here are some more photos from strengthening the slope of the bridge in Ras Al Khaimah

  • Writer: Ecocon Group of Companies
    Ecocon Group of Companies
  • Jul 19, 2020
  • 1 min read

The composite of crushed stone particles bounded by the binding RBS material has 100% water permeability.

A bounded and fixed surface is easy to be cleaned by rain or water jet.

 
 
 

Comentarios


bottom of page